Nautica Amphitheater
Cleveland, Ohio
Construction Cost: $ 1.8 Million
Completion Date: 2002
Twin slant high center masts working in consert with perimeter struts and tie-down cables to support a distinctive double-layer tensile membrane canopy roof structure for the 5,000 seat amphitheater in downtown Cleveland. 作者:
夏日冰红茶 时间: 2007-2-2 10:53 标题: 回复: 国外索膜工程集粹
Twin slant high center masts working in consert with perimeter struts and tie-down cables to support a distinctive double-layer tensile membrane canopy roof structure for the 5,000 seat amphitheater in downtown Cleveland.