游客:
注册
|
登录
中华钢结构论坛 China Structure Forum
»
A1. 索膜
‹‹ 上一主题
|
下一主题 ››
投票
交易
悬赏
活动
打印
|
推荐
|
订阅
|
收藏
国外索膜工程集粹
夏日冰红茶
积分
79
帖子
60
#1
2007-2-2 10:48
Nautica Amphitheater
Cleveland, Ohio
Construction Cost: $ 1.8 Million
Completion Date: 2002
Twin slant high center masts working in consert with perimeter struts and tie-down cables to support a distinctive double-layer tensile membrane canopy roof structure for the 5,000 seat amphitheater in downtown Cleveland.
夏日冰红茶
积分
79
帖子
60
#2
2007-2-2 10:53
Twin slant high center masts working in consert with perimeter struts and tie-down cables to support a distinctive double-layer tensile membrane canopy roof structure for the 5,000 seat amphitheater in downtown Cleveland.
投票
交易
悬赏
活动
联系我们
版权声明
发帖规则
论坛制度
关于我们
版权所有.中华钢结构论坛.永久保留所有权利
[Processing Time]
User:0.28, System:0.03, Children of user:0, Children of system:0