Nautica Amphitheater
Cleveland, Ohio
Construction Cost: $ 1.8 Million
Completion Date: 2002
Twin slant high center masts working in consert with perimeter struts and tie-down cables to support a distinctive double-layer tensile membrane canopy roof structure for the 5,000 seat amphitheater in downtown Cleveland.
Twin slant high center masts working in consert with perimeter struts and tie-down cables to support a distinctive double-layer tensile membrane canopy roof structure for the 5,000 seat amphitheater in downtown Cleveland.